Soils and Soakaways - 1

July

Next

Soil pipe

The final laying and connection of the soil pipes and surface drainage was done in July 2005. The pipe in the foreground takes water from the main roof and garage to a soakaway in the rear garden.

The temporary power supply can be seen centre-rear of this photograph