![]() |
Paul Taylor Building Services Telephone: 01269 593149 Mobile: 07788 724995 |
Soils and Soakaways - 1
July

The final laying and connection of the soil pipes and surface drainage was done in July 2005. The pipe in the foreground takes water from the main roof and garage to a soakaway in the rear garden.
The temporary power supply can be seen centre-rear of this photograph
© 2004/2005 Paul Taylor Site updated 02 September 2007 Webmaster