Rear

June 2-5


Rear painted

Once the rendering was dry, the walls were treated with a stabilizing solution, then given two coats of white masonry paint (supplied by Wickes).


Side

The weather was wet in early June, but two good days saw the painting completed. Note the roof vents to the soil pipes and shower.