Garage - Roof details & bracing
End April

Construction detail - wall and roof of bed 5
The photograph below shows some insulation in place

This looks confusing but the photograph was taken looking down from the floor of the 5th bedroom into the garage below. The diagonal structural bracing is clearly visible. The next stage will be to put insulation between the studs and rafters, then add the plasterboards
View of un-tiled garage roof and blockwork on a gable end. A valley is shortly to be installed