Site clearance and footings - November 2004

Building a Timber Frame House

clearing the topsoil

Topsoil is removed and the ground made ready for digging the footings


Digging the footings

Digging the footings

The area around the footings was covered with 4 inches of scalpings to provide a "clean" working area

32 tons of scalping were laid to keep the site "clean"


Pouring the concrete

Footings poured